3-6 weeks from purchase.
On-site installation for most sheds can be completed within one or two days. Your installer will arrive with the wood pre-cut and pre-primed, minimizing disruption to your day and your landscape. Larger and/or more complex sheds will require additional days, yet still provide minimal disruption. Timing also varies based on location, leveling, and carry time at the assembly site.
Our sheds meet or exceed 40 pounds per square foot.
Leveling blocks are not included with the purchase. Leveling blocks are not required in all states/counties, but the member should check his/her local requirements. Your building will be built on 4x4 pressure-treated runners. We will use treated leveling materials and shingle shims to level up the floor prior to installing the shed. If your ground is out of level greater than 6 inches, leveling blocks will be needed.
You should check with your local Building Authority and Homeowners Association prior to installation to make sure your shed is compliant with all codes, easements and setbacks.
Painting is not included with purchase and is the homeowner’s responsibility. Gorilla sheds are built using pre-primed siding. Manufacturer requires the use of 100% acrylic latex paint. All exterior horizontal and vertical joints must be painted. Doors should be painted on all 6 sides including front, back, and all four edges. Painting your shed to match your home often meets HOA requirements.